OEM / ODM & Volume Supply

Industrial UAV Systems, Configured for Your Program

TopTorq supports UAV manufacturers, system integrators and professional operators with volume supply and project-based OEM/ODM collaboration. Source individual products or request an engineering review for a configured control, propulsion and payload program.

Choose the right engagement model

From Standard Supply to Configured UAV Programs

Not every project requires a custom design. We separate standard-product supply, configuration work and new development so that commercial scope, technical risk and lead-time expectations are clear from the start.

01

Volume Supply

Source approved standard products for repeat purchasing, fleet maintenance and production programs.

02

Configured OEM

Review eligible changes to specification, interface, cable, label, packaging and documentation, subject to technical feasibility and MOQ.

03

ODM Development

For new requirements that cannot be met by a standard platform, define the application, validation plan, ownership, tooling and production path in writing.

Recommended configuration paths

Start with a Defined Engineering Review

The paths below are starting points for technical and commercial review. They are not flight-ready aircraft packages, and final compatibility must be validated in the customer’s approved system architecture.

Configuration A

GS7H Ground-Control Integration

For UAV teams seeking a high-brightness Android ground-controller platform for PX4, MAVLink or ArduPilot workflows.

Featured productGS7H Smart Ground Controller.

Review scopeFlight-control protocol, regional cellular/radio configuration, display workflow, antennas and accessories.

Start GS7H Review
Configuration B

12-inch Propulsion Evaluation Set

For small-UAV and professional-aerial-imaging teams evaluating an approximately 12-inch propulsion class.

Featured productsM100 6S Brushless Motor + R100 12 × 5.7 Carbon-Fiber Propeller.

Important boundaryThis is a propulsion evaluation path, not a pre-approved motor–propeller–ESC flight package.

Review 12-inch Propulsion
Configuration C

EO/IR Inspection Payload Review

For UAV inspection, infrastructure evaluation and professional mission-payload integration programs requiring visible and thermal imagery.

Featured productW101 Dual-Sensor EO/IR Gimbal.

Review scopePayload capacity, 12V power, video/data path, thermal-core variant, mounting, software workflow and destination market.

Start W101 Payload Review
Configuration D

Integrated Small-UAV Architecture Review

For system integrators assessing a compact professional UAV architecture with ground control, propulsion and EO/IR payload workstreams.

Featured productsGS7H + M100 + R100 + W101.

Not included unless quotedAirframe, flight controller, ESC, battery, power distribution, radio/air unit, wiring harness, mounting and flight validation.

Request Integrated System Review

Engineering and validation

A Defined Path from Requirement to Production Release

Requirements Review

Review the intended platform, application, operating environment, interface, performance target, forecast and destination market.

Feasibility & Proposal

Confirm the correct path: standard supply, configured OEM or development. Define scope, MOQ, tooling, sample plan and estimated lead time.

Sample & Validation

Evaluate approved samples against the agreed configuration and validation criteria before pilot or production release.

Production Release

Confirm configuration, quality criteria, packaging, documentation and commercial terms before production begins.

Quality and compliance

Product-Specific Documentation, Confirmed Before Release

Quality and compliance requirements vary by product configuration, destination market and application. The final scope is confirmed in the quotation, quality plan or approved project documentation—not assumed from a generic product claim.

  • Approved configuration: Product, interface, packaging and requested documentation are confirmed before release.
  • Defined quality scope: Inspection and validation checkpoints are aligned to the approved program.
  • Traceable production: Lot or serial identification is applied where included in the agreed product plan.
  • Market-specific review: Requested declarations, test reports, material information and ingress-protection evidence are reviewed for the final SKU and destination market.

Start your RFQ

Tell Us What You Are Building

Share your platform, mission, required product layer, target volume and destination market. Our team will identify the appropriate supply or configuration path.

By submitting this form, you request a technical and commercial review. Do not upload or share proprietary information until your NDA requirement has been confirmed.